beautypg.com

Mounting installation, 1 din-rail mounting, Din-rail mounting – Allied Telesis AT-IMC1000TP/SFP User Manual

Page 14

background image

Mounting Installation

DIN-Rail Mounting

14

AT-IMC1000TP/SFP Industrial Gigabit PoE+ Media Converter

3. Mounting Installation

3.1 DIN-Rail Mounting

The DIN-Rail is screwed on the industrial switch when out of factory. If the DIN-Rail is not screwed on the industrial
switch, please see the following figure to screw the DIN-Rail on the switch. Follow the below steps to hang the
industrial switch.

1. Use the screws to screw on the DIN-Rail clip on the industrial switch.

2. To remove the DIN-Rail clip, reverse step 1.

FIGURE 3-1 DIN-Rail Bracket Mounting Screw Location

3. First, insert the top of DIN-Rail bracket onto the top of the DIN-Rail track.