Campbell Scientific Sentek EnviroSCAN Access Tube Installation Guide User Manual
Page 53

Toolkit items
© Sent ek Pt y Lt d
Page 50
Part No. 70150
1 x Regular T-handle
The T-handle is attached to the
auger extension rods, which are
attached to the augers to complete
the auger assembly. This auger
assembly is used to manually drill
holes for access tubes.
Part No. 70160
1 x Expandable bung
tightening tool
The expandable bung tightening tool
is used to tighten or release the
expandable bung, which is inserted
in the bottom of the access tube to
make the bottom of the access tube
watertight.
Part No. 70190
Pair of tommy bars
The tommy bars are used to tighten
and loosen installation tools to and
from extension rods. They are also
used to combine or detach multiple
extension rods.
Part No. 70195
1 x Access tube bailer
The access tube bailer is attached to
a long rope. The bailer is used to
empty water and liquid mud from the
access tube.
Part No. 70305
1 x Tube extraction tool
The extraction tool is used to grip to
access tube for removal from the
ground
Part No. 81035
1 x Access Tube Installation
Manual
The manual describes the
recommended installation procedure
in all soil types.
Part B – Tripod Kit (Part Number 07150)
Part No. 70300
1 x Tool Bag No. 3
The Tool Bag is specially designed
to hold and protect all the tools in the
Tripod Kit.
Part No. 70205
1 x Nylon dolly
The nylon dolly is used to hammer
the last part of the access tube into
the ground through the cylinder of
the tripod to the final recommended
depth marker.
Part No. 70210
1 x Heavy duty dolly
The heavy duty dolly is used to
hammer in the access tube during
installation. This dolly can also be
attached to the auger extension
rods. The dolly, fitted to the
extension rods, is inserted into long
access tubes, where the rods
minimize the flexing of the access
tube above the tripod during the
hammering process.