beautypg.com

Ashcroft 2274 Digital Industrial Gauge User Manual

Page 23

background image

– 23 –

Installation Procedure for 2274 XU2:

ƽ

ESD precautions should be taken. See page 31 for details.

1. Ensure all power is off/disconnected from the circuit.

2. Connect the red wire (G) to the positive power terminal.

3. Connect the black wire (H) to the positive meter terminal.

Wiring Switch 1:

Normally Open: Use the white and brown wires.

Normally Closed: Use the green and brown wires.

Wiring Switch 2:

Normally Open: Use the blue and orange wires.

Normally Closed: Use the yellow and orange wires.

I&M008-10109-DIG Rev F 07-12_layout 10/14/13 9:45 AM Page 23

This manual is related to the following products: