Machine set up / installation – Dake Model Zip 28 User Manual
Page 3
![background image](/manuals/410461/3/background.png)
3
MACHINE SET UP / INSTALLATION
1. Machine assembly / set up installation:
1.1 Saw base / pedestal:
1. Remove preassembled base from shipping container. Check for loose parts and
discard container.
1.2 Saw assembly:
1. Carefully remove the saw from the shipping container. Take care not to damage any
components, check for any loosen items. Discard container.
1. Machine Placement:
1.3 Anchoring the machine:
NOTE: Machine must be located away from, congested areas, traffic areas, close
proximity to where others will be working!
Bandsaw should always be positioned so operator can be accessible to all sides and
that there are no trip hazards or liquids present. Keep sides of saw area clear so there is
enough room to feed material into the saw. Keep the back of the saw 32” away from
walls.
Saw must be anchored on a level hard surface! Machine must be removed from the
pallet. Anchoring of the machine must be done to prevent movement of the unit during
operation. The base is supplied with two mounting holes one on the front and one on the
rear of the saw. (Figure 1) Anchoring must be done in a suitable fashion.
Figure 1 figure 2