INSTALLATION INSTRUCTIONS

AuraLast

®

Exterior Door Frame Assembly Instructions

2

Preparing the Rough Opening

Is subfloor level and solid? Provide a flat, level, clean bearing
surface so the sill may be caulked and sealed to the opening.
Scrape, sand, or fill as required.

If a height plate is required to bring the sill up to the level of
the floor covering: Be sure it is as wide as the sill and as long as
the rough opening. Note: Caulk thoroughly under height plate.

Is opening square? Check all corners with a framing square.
Double-check by comparing diagonal measurements. Fix any
problems now.

Are framing walls plumb? Use a level and check both sides of
opening both ways. Fix any problems now.

Are the wall surfaces around the opening in the same plane?
Fix any problems now.

Is the opening the correct size? Make sure the completed door
unit will fit (height & width) in door opening. There should be
approximately 1/2" clearance all the way around the door unit.
Fix any problems now.

Preparing the Door Unit

Determine the appropriate door swing and prepare for hinges.

Mortise for Hinges

Existing Door
If using an existing door with the hinges already installed,
remove one hinge from the door and use it as a template to
mark the jamb.
Lay the jamb next to the door so that the top of the jamb
is 7/8" beyond the top of the door and mark side jamb for
hinges.

Wall

Straight?

Wall

Straight?

Check
each
side
both
ways

Check all four corners
with square

Check floor
under sill

Equal

Equal

Compare
diagonals

Finished
Floor

Subfloor

Height Plate

Sill

Jamb Face

Hinge Mortise – Side Jamb and Door

Door Edge

7/8"