beautypg.com

Completing the configuration – HP ProLiant BL25p G2 Server-Blade User Manual

Page 21

background image

Setup 21

3.

Install the server blade. When the server blade is fully inserted, it locks into place.

The default setting for server blades initiates automatic power up.

CAUTION: To prevent improper cooling and thermal damage, do not operate the server blade enclosure

unless all bays are populated with either a component or a blank.

NOTE: The first server blade must be installed into a server blade enclosure to facilitate naming the server

blade enclosure, the rack, and the interconnects. Complete the system configuration before installing

additional server blades.

Completing the configuration

To complete the server blade and HP BladeSystem configuration, refer to the hardware installation and

configuration poster that ships with the server blade enclosure.