beautypg.com

Installing the trusted platform module board – HP ProLiant BL280c G6 Server-Blade User Manual

Page 44

background image

Hardware options installation 44

Any attempt to remove an installed TPM from the system board breaks or disfigures the TPM security

rivet. Upon locating a broken or disfigured rivet on an installed TPM, administrators should consider the

system compromised and take appropriate measures to ensure the integrity of the system data.

When using BitLocker™, always retain the recovery key/password. The recovery key/password is

required to enter Recovery Mode after BitLocker™ detects a possible compromise of system integrity.

HP is not liable for blocked data access caused by improper TPM use. For operating instructions, see the

encryption technology feature documentation provided by the operating system.

Installing the Trusted Platform Module board

WARNING:

To reduce the risk of personal injury from hot surfaces, allow the drives and the

internal system components to cool before touching them.

1.

Power down the server blade (on page

11

).

2.

Remove the server blade (on page

12

).

3.

Place the server blade on a flat, level work surface.

4.

Remove the access panel (on page

13

).

5.

Remove all mezzanine cards ("

Mezzanine card option

" on page

36

).

CAUTION:

Any attempt to remove an installed TPM from the system board breaks or disfigures

the TPM security rivet. Upon locating a broken or disfigured rivet on an installed TPM,

administrators should consider the system compromised and take appropriate measures to ensure

the integrity of the system data.

6.

Install the TPM board. Press down on the connector to seat the board ("

System board components

" on

page

8

).