beautypg.com

Hot-plug hard drive option – HP ProLiant DL580 G7 Server User Manual

Page 53

background image

Hardware options installation 53

8.

Install the DIMM. See "Memory options (on page

43

)."

9.

Close the memory cartridge cover.

10.

Install the memory cartridge.

11.

Install the processor memory drawer cover.

12.

Install the processor memory drawer.

13.

Power up the server (on page

25

).

Hot-plug hard drive option

When adding hard drives to the server, observe the following general guidelines:

The system automatically sets all device numbers.

If only one hard drive is used, install it in the bay with the lowest device number.

Hard drives must be SFF types.