beautypg.com

Installation, 2 installing the conduit connection kit – APC BC300 User Manual

Page 7

background image

Installation

990-1400A

Installation Guide APC BC300 Series 60kW 208/480V UPS

7

3.1.1 UPS Footprint (measurements in inches & mm)

Figure 1 - Footprint

3.2

Installing the Conduit Connection Kit

Insulated and other tools required

13 mm ratchet or wrench

T20 torx screwdriver

36.00 (914)

Minimum Service

Clearance

39.4

(1000)

31.7

(804)

59.1

(1500)

A

A

Front View

Side View

36.00 (914)

Recommended

Cooling

Clearance

31.7

(804)

Section A-A

View From Inside Cabinet, Looking Down

Conduit

Connection

Box

Cable Entry

(Rear)

(Front)

17.9

(455)

17.9

(455)

39.4

(1000)

19.8

(504)

27.9

(708)

31.7

(804)

Notes:
1. All dimensions are in inches (millimeters).
2. Minimum cooling and service clearance 36.00 (914).
3. Conduit entry is bottom of unit.
4. Unit weight = 2214lbs (1005kg)
5. Installation must comply with all applicable national and local codes