beautypg.com

APC BC300 User Manual

Page 3

background image

990-1400A

Installation Guide APC BC300 Series 60kW 208/480V UPS

3

Contents:

1.0

Introduction 4

1.1

Tools and Equipment Needed

4

2.0

Receiving, Unpacking, Moving
and Storing the UPS and Batteries

5

2.1

Receiving, Unpacking and Moving to Site

5

2.2

Storing the UPS and Batteries

5

3.0

Installation 6

3.1

Requirements on Site

6

3.1.1 UPS Footprint (measurements in inches & mm)

7

3.2

Installing the Conduit Connection Kit

7

3.2.1 Conduit Connection Kit Contents

8

3.2.2 Installing Pedestals

8

3.2.3 Installing Conduit Box and Base Covers

8

3.3

Installing the Maintenance Bypass Panel and UPS

9

3.3.1 Component Overview (door open)

11

3.3.2 Wire Terminals

12

3.3.3 Wiring Diagram for BC300

13

3.3.4 Single Line Diagram for BC300

14

3.3.5 External Connection Board

17

3.3.6 Communication Interface Board (Option)

18

3.4

Smart Slot and Connection of Triple Chassis

19

3.5

APC BC300 Triple Chassis

20

3.5.1 Safety Warnings

20

3.5.2 Product Description

20

3.5.3 Installing Management Products

21

3.5.4 Powering the APC BC300 Triple Chassis

22

3.5.5 Troubleshooting

23

3.5.6 Product Specifications

24

3.6

Installation of External Batteries and Battery Breaker

26

3.6.1 Battery Installation

26

3.6.2 Battery Replacement

29

4.0

Initial Start-up and Phase Check

30

4.1

Initial Start-up and Phase Check (External Batteries)

30

5.0

Clearing the Events Log

31

6.0

Start-up and Shutdown Procedure

32

6.1

Start-up from Maintenance Bypass

32

6.2

Shutdown Procedure

32

7.0

Technical Specifications

34

7.1

APC BC300 Series 60 kW Technical Data

34

7.2

Battery Specifications

35

7.3

Dimensions/Weight

35

8.0

How to Contact APC

36