APC BC300 User Manual
Page 3

990-1400A
Installation Guide APC BC300 Series 60kW 208/480V UPS
3
Contents:
1.0
Introduction 4
1.1
Tools and Equipment Needed
4
2.0
Receiving, Unpacking, Moving
and Storing the UPS and Batteries
5
2.1
Receiving, Unpacking and Moving to Site
5
2.2
Storing the UPS and Batteries
5
3.0
Installation 6
3.1
Requirements on Site
6
3.1.1 UPS Footprint (measurements in inches & mm)
7
3.2
Installing the Conduit Connection Kit
7
3.2.1 Conduit Connection Kit Contents
8
3.2.2 Installing Pedestals
8
3.2.3 Installing Conduit Box and Base Covers
8
3.3
Installing the Maintenance Bypass Panel and UPS
9
3.3.1 Component Overview (door open)
11
3.3.2 Wire Terminals
12
3.3.3 Wiring Diagram for BC300
13
3.3.4 Single Line Diagram for BC300
14
3.3.5 External Connection Board
17
3.3.6 Communication Interface Board (Option)
18
3.4
Smart Slot and Connection of Triple Chassis
19
3.5
APC BC300 Triple Chassis
20
3.5.1 Safety Warnings
20
3.5.2 Product Description
20
3.5.3 Installing Management Products
21
3.5.4 Powering the APC BC300 Triple Chassis
22
3.5.5 Troubleshooting
23
3.5.6 Product Specifications
24
3.6
Installation of External Batteries and Battery Breaker
26
3.6.1 Battery Installation
26
3.6.2 Battery Replacement
29
4.0
Initial Start-up and Phase Check
30
4.1
Initial Start-up and Phase Check (External Batteries)
30
5.0
Clearing the Events Log
31
6.0
Start-up and Shutdown Procedure
32
6.1
Start-up from Maintenance Bypass
32
6.2
Shutdown Procedure
32
7.0
Technical Specifications
34
7.1
APC BC300 Series 60 kW Technical Data
34
7.2
Battery Specifications
35
7.3
Dimensions/Weight
35
8.0
How to Contact APC
36