Final view 4.7 connecting the system, 8 measuring resistance and measures’ table – Ouellet OTM User Manual
Page 21
Final view
4.7 Connecting the System
The system must be connected by a master electrician.
Cold lead:
- 240V/208V connection:
- 120V connection:
Line 1 - Black
Line - Black
Line 2 - Red
Neutral - White
Bare wire - ground
Bare wire - ground
Measure the cable’s electrical resistance and record the readings on line
5) Upon installing the thermostat of the measures’ table.
4.8 Measuring Resistance and Measures’ Table
- The master electrician who installed and connected the Thermat system must
complete the measures’ table (this label is available at the opening of the
product) and give it to the customer. This sheet must be kept near the
electrical service.
If this table is not duly completed, the warranty may be annulled. Warranty
terms are set out in Section 8.
22
self-levelling
cement
cement glue
floor covering
IMPORTANT
IMPORTANT
- OAC (1 page)
- OACP (1 page)
- OAE (1 page)
- OCH (1 page)
- OCH-RF (1 page)
- OCH-WB (1 page)
- OCP (1 page)
- ODL (1 page)
- ODS (3 pages)
- OFH (1 page)
- OFM (1 page)
- OHY (4 pages)
- ORC (2 pages)
- OTR (26 pages)
- OVB-HL (16 pages)
- OVB-QS (22 pages)
- OVE (2 pages)
- OVN (4 pages)
- OVR (1 page)
- OVS (1 page)
- OWC-M (26 pages)
- OWC-R (24 pages)
- OWS (26 pages)
- UFO-R (24 pages)
- WHFC (2 pages)
- RBH (2 pages)
- OAWH (1 page)
- OCA (1 page)
- OCB (1 page)
- ODIA (1 page)
- OEC (1 page)
- OHB (1 page)
- OLA (1 page)
- OLI (1 page)
- OMB (1 page)
- OPA (1 page)
- OPI (1 page)
- OPR (1 page)
- OAF (5 pages)
- OAM (4 pages)
- OAS-MD (1 page)
- OAV (1 page)
- OCC (1 page)
- OHV (4 pages)