Electrical Installation: External Bypass Static Switch Wiring

Symmetra MW 800 kW 3 × 400/230 V Installation - 990-1510D

19

Top cable entry

Loosen the 8 screws to remove top covers. Drill holes for grommets. Re-fit the covers and
install the grommets.

Feed the cables through the grommets. Connect cables at cable connection points.

Connect grounding electrode conductor to busbar locations.

2.3 in / 58 mm

1.75 in /
44.45 mm

1.75 in /
44.45 mm

X022

X021

X007

X010

X011

X008B

X008A

X012

X013

X014A

X014B

X017

X405

~

~

Normal

UPS Summary

Normal

L1 IN

L2 IN

L3 IN

L1 OUT

L2 OUT

L3 OUT

L1 IN

L1 OUT

L2 IN

L2 OUT

L3 IN

L3 OUT

Top view of top cable entry

Port for communication cables

Top view of AC IN & OUT cable
connections

External Bypass SSW

Note

No drilling or cutting should take place over the top of the External Bypass SSW.