OPERATION

1900 07/11

Operation Section 4-12

© 2011 Alamo Group Inc.

OPERA

T

ION

6.2 Boom Unit Pre-Operation Inspection and Service

Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be

repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020

Periodically inspect all moving parts for wear and replace when

necessary with authorized service parts. Look for loose fasteners, worn

or broken parts, and leaky or loose fittings. Make sure all pins have

cotter pins and washers. Serious injury may occur from not maintaining

this machine in good working order.

(SG-21)

6.1 Tractor Pre-Operation Inspection/Service

Refer to the tractor operator’s manual to ensure a

complete pre-operation inspection and scheduled

service is performed according to the

manufacturers recommendations. The following

are some of the items that require daily service and

inspection:

Tire condition/air pressure

Wheel lug bolts

Steering linkage

PTO shield

SMV sign is clean and visible

Tractor’s lights are clean and functional

Tractor Seat belt is in good condition

Tractor ROPS is in good condition

ROPS is in the raised position

No tractor oil leaks

Radiator free of debris

Engine oil level and condition

Engine coolant level and condition

Power brake fluid level

Power steering fluid level

Fuel condition and level

Sufficient lubrication at all lube points

Air filter condition OPS-U-0030