Set-up – Warren Controls E030 Electric Actuator User Manual
Page 10
10
2600 Emrick Blvd • Bethlehem, PA 18020 • USA • 800-922-0085 • www.warrencontrols.com
SET-UP
Prior to enabling the power perform the following check:
1.
Verify the Control Signal. The default Control Signal is 2-10 Vdc (see the wiring diagram for 4-20 mAdc).
2.
Review the Control Action by inspecting the Rotation Switch position.
3.
Confirm the Power Failure mode by inspecting the Fail-Safe switch.
4.
Verify that the actuator is correctly installed on the valve body
5.
Enable the Power Source.
6.
Perform manual Adaption (Auto-Calibration).
This manual is related to the following products: