beautypg.com

Operation – Techne MCS-104XL User Manual

Page 27

background image

P A G E 25

M i c r o C a r r i e r S t i r r e r O P E R A T O R ’ S M A N U A L

OPERATION

• Reference must be made to chemical manufacturer's

instructions for the preparation of the culture medium and cell
culture techniques.

• The MCS-104L may be used with a water bath, MWB-12L, and

this is described in a separate leaflet.

• Place the primed culture vessels in position over the location

bosses on the platform.

• Set the “rpm” control to the required speed.

• Set the “interval/continuous” switch for periodic or continuous

stirring as required.

• If interval stirring is selected, set the stirring periods to the on/off

stirring times required.

• Switch on to start the attachment phase.

• At the end of the attachment phase, reset the interval/continuous

switch and the stirring time controls as appropriate for the growth
phase.

• At the end of the growth phase switch off and allow the stirrer to

stop before removing the vessels.

This manual is related to the following products: