Where the meter has been approved by the sanitary requirements of the European Hygienic
Engineering and Design Group, you MUST give consideration to:
• Installation - install the meter at an angle to allow self-draining (see illustration).
• Cleaning fluids - cleaning fluids should flow uphill with a velocity rate greater than
1.5 m/s / 5ft/s. If the process flow is downhill, install a flow restrictor downstream of the
meter. This will make sure that the meter is completely filled with the cleaning fluid.
• Process connections and seals MUST be in accordance with EHEDG documentation.
The manufacturer also recommends that you refer to EHEDG (www.ehedg.org) document
number 8 "HYGIENIC EQUIPMENT DESIGN CRITERIA".
3.4.10 Heating and insulation
Heating
Heating
Heating
Heating
The meter can be heated by electrical tape (or similar) as shown. ONLY heat the meter in the
area marked A.
Insulation
Insulation
Insulation
Insulation
The meter can also be insulated to a maximum depth as shown (B). Do not insulate above this
depth as this will cause the electronics to overheat.
Heated area
Electrical heating and insulation
1 Area that can be heated (A). Refer to the table for the maximum sizes.
2 Maximum depth of insulation (B). Refer to the table.
S100
S150
S250
Dimension of A
mm
200
250
250
Inches
7.9
9.8
9.8
Dimension of B
mm
50
Inches
2.0