beautypg.com

Installation – KROHNE OPTIMASS 2400 User Manual

Page 22

background image

3

INSTALLATION

22

OPTIMASS 2400

www.krohne.com

07/2014 - 4003533101- MA OPTIMASS 2400 R01 en

Where the meter has been approved by the sanitary requirements of the European Hygienic
Engineering and Design Group, you MUST give consideration to:

• Installation - install the meter at an angle to allow self-draining (see illustration).
• Cleaning fluids - cleaning fluids should flow uphill with a velocity rate greater than

1.5 m/s / 5ft/s. If the process flow is downhill, install a flow restrictor downstream of the
meter. This will make sure that the meter is completely filled with the cleaning fluid.

• Process connections and seals MUST be in accordance with EHEDG documentation.

The manufacturer also recommends that you refer to EHEDG (www.ehedg.org) document
number 8 "HYGIENIC EQUIPMENT DESIGN CRITERIA".

3.4.10 Heating and insulation

Heating

Heating

Heating

Heating

The meter can be heated by electrical tape (or similar) as shown. ONLY heat the meter in the
area marked A.

Insulation

Insulation

Insulation

Insulation

The meter can also be insulated to a maximum depth as shown (B). Do not insulate above this
depth as this will cause the electronics to overheat.

Heated area

Electrical heating and insulation

1 Area that can be heated (A). Refer to the table for the maximum sizes.
2 Maximum depth of insulation (B). Refer to the table.

S100

S150

S250

Dimension of A

mm

200

250

250

Inches

7.9

9.8

9.8

Dimension of B

mm

50

Inches

2.0

MA_OPTIMASS_2400_en_140515_4003533101_R01.book Page 22 Thursday, July 31, 2014 5:08 PM