beautypg.com

Start-up, Start-up 5.1 start-up purge set – KROHNE DK 32 Purge EN User Manual

Page 17

background image

START-UP

5

17

DK32

www.krohne.com

04/2011 - 4000898801 MA DK32 Air purge set R02 en

Start-up

5.1 Start-up purge set

CAUTION!

When starting up the device, the following points must be observed:

Compare the actual operating pressure and the product temperature of the system with the
specifications on the nameplate (PS and TS). These specifications may not be exceeded.

Make sure materials are compatible.

Slowly open the shut-off valve 2.

When measuring gases, increase pressure slowly 5.

Avoid float impact (e.g. caused by solenoid valves), as this is likely to damage the measuring
unit or float.

1 DK32 - Variable-area flowmeter with metering valve
2 Ball valve (on - off)
3 Inlet NPT ½" - max 270° rotatable
4 Outlet NPT ½" - max 270° rotatable
5 Needle valve for setting the required flow rate
6 2" mounting pipe (not included in delivery)
7 Poppet check valve (¼")
8 Tube: 10x1.5mm (0.39x0.059")
9 Mounting plate incl. 2x U-bolt hanger (for 2" pipe installation)

MA_DK32_Purge_R02_en_898801_PRT.book Page 17 Wednesday, April 6, 2011 3:01 PM