Operation, Operation 5.1 start-up, 2 configuration tool – KROHNE PTD 600 EN User Manual
Page 13
OPERATION
5
13
PTD 600
www.krohne.com
03/2012 - 4001946801 - MA PTD 600 R01 en
Operation
5.1 Start-up
Before connecting to power, please check that the system has been correctly installed.
This includes:
• The device must be mechanically safe and mounted in compliance with the regulations.
• Check the leak-tightness of the process connection.
• Make sure that the M12 plug is properly connected.
• The power connections must have been made in compliance with the regulations.
• Check that the electrical operating data of the power supply are correct.
• Switching on the power.
5.2 Configuration tool
The configuration tool (order number XGP9000010) can be ordered optionally to configure the
pressure transmitter.
Scope of delivery:
• Interface unit
• CD with software and product drivers (DTM)
• USB cable
• Cable with M12 connector
The configuration tool connects the transmitter to a computer. With the proper software, an
online connection to the pressure transmitter can be established.
When using this tool, device information including the serial number and measuring point
numbers are displayed on the computer. Settings including the zero point, measuring range,
signal limits and others can be configured.
There is also a reset function to return to the default values.
DANGER!
Disconnect the power supply before connecting the configuration tool to the transmitter!
.book Page 13 Friday, March 23, 2012 10:14 AM