Installing the switches in an equipment rack – Allied Telesis Layer 3 Gigabit Ethernet Switch x600-24Ts-POE User Manual
Page 69

x600 Layer 3 Gigabit Ethernet Switch Installation Guide
69
Installing the Switches in an Equipment Rack
Perform the following procedure to install each switch in a standard
19-inch rack:
Note
Steps 1, 2, and 3 are optional. These steps provide instructions on
how to remove the snap-on plastic feet from the bottom of a switch.
You can leave the feet on.
1. Place the switch upside down on a level, secure surface.
2. Using a flat-head screwdriver, remove the snap-on plastic feet from the
bottom of the switch, as shown in Figure 30.
Figure 30. Removing the Feet
3. Turn the switch over.
4. Attach a rack-mount bracket to one side of the switch using four of the
screws that come with the switch, as shown in Figure 31.
Figure 31. Attaching Rack-Mount Brackets
1327
1
3
5
7
9
11
13
15
17
19
21R
23R
2
4
6
8
10
12
14
16
18
20
22R
24R
x600-24T
s/XP
Layer 3 G
igabit E
thenet
Switch
CLASS 1
LASE
R PRODU
CT
D/C
L/A
1000 LIN
K /
ACT
HDX /
COL
FDX
10/100 L
INK /
ACT
POR
T ACTIV
ITY
26
25
L/A
XFP
XFP
L/A
D/C
D/C
L/A
L/A
STAC
K
PRES
MSTR
L/A
1
2
SFP
21
22
23
24
1
3
5
7
9
11
13
15
17
19
21R
23R
2
4
6
8
10
12
14
16
18
20
22R
24R
FAULT
RPS
MASTER
PWR
STATUS
21
22
23
24
SFP
L/A
BUSY
READY
FAULT
SD
RESET
CONSOL
E