beautypg.com

Figure 38. removing the plastic protector – Allied Telesis Layer 3 Gigabit Ethernet Switch x600-24Ts-POE User Manual

Page 75

background image

x600 Layer 3 Gigabit Ethernet Switch Installation Guide

75

Note

Do not cable AT-StackXG module until you have prepared the
switch’s Alliedware Plus Operating System software on the x600
Series Switches as explained in the x600 series AlliedWare Plus
5.3.1 Software Reference
.

5. Remove the plastic protector from the connector at one end of the

stacking cable.

Figure 38. Removing the Plastic Protector

6. Connect the cable to either Stack Port 1 or Stack Port 2 on the

stacking module and secure by tightening the two captive
thumbscrews.

7. Remove the plastic protector from the connector at the other end of the

stacking cable and connect it to a Stack Port on the stacking module in
the next switch of the stack. A stacking cable must crossover and
connect to a different port on the next stacking module. Stack Port 1 on
a module must connect to Stack Port 2 on the next module.

Caution

Do not connect two Stack Port 1 ports or Stack Port 2 ports together.

1244