Allied Telesis Layer 3 Gigabit Ethernet Switch x600-24Ts-POE User Manual
Page 81
x600 Layer 3 Gigabit Ethernet Switch Installation Guide
81
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place. See Figure
Figure 40. Installing an SFP Transceiver
5. For the x600-24Ts and x600-24Ts/XP switches, verify that the handle
on the SFP transceiver is in the upright position, as shown in
Figure 41, to prevent inadvertently removing the transceiver.
Figure 41. Positioning Handles on the x600-24Ts and x600-24Ts/XP
Switches