beautypg.com

2 location - blended water installation, 2 location - cold water installation – Stuart Turner Monsoon Extra S1.4 bar Single User Manual

Page 6

background image

- 6 -

Cont ...

2 LOCATION - BLENDED WATER INSTALLATION

2.26

Location: The pump must, for optimum performance, be sited as close as

possible to and never more than 4 metres from the HOT WATER cylinder. The

pump should always be sited BELOW the HOT WATER take-off from the cylinder.

2 LOCATION - COLD WATER INSTALLATION

2.27

The cold water supply: The supply must be AIR FREE and have a

DEDICATED CONNECTION to the tank which should be via a tank connector,

positioned at a slightly lower level (25 mm minimum) than the feed pipe to the hot

water

cylinder.

Do not connect to the mains.

Outlet head must be
below bottom of cold
water tank and able
to pass a minimum of
1 l/min of gravity flow

Fig. 2

Static inlet pressure

10

metres max

1

metre min

Fig. 3

Outlet head must be
below bottom of cold
water tank and able
to pass a minimum of
1 l/min of gravity flow

Static inlet pressure

10

metres max

1

metre min