Dimensional diagram – Warner Electric CBPC-3590 User Manual
Page 5
Warner Electric • 800-825-9050
P-291-1 • 819-0526 5
q
4. Mount and attach the CBPC-3590
controller to the other side of the vibration
isolator mount . Insure that control and mounts
are fastened securely at both the control and the
machine frame .
q
5. With the control mounted, route the wiring cables
such that they can be easily attached to the
external connectors on the control . Insure sufficient
length so that undue stress is not placed on either
the connectors or the cables to the control .
Note: For new installations where no wiring previously
exists, see the connector wiring diagram, Figure 4 for
pin/function descriptions.
q
6. Reconnect the power/clutch-brake wiring
connector to the large plug on the CBPC-3590
control and tighten snugly .
q
7 . Reconnect the encoder cable connector to
the small plug on the CBPC-3590 control and
tighten snugly .
q
8. Insure everything is connected properly and
the control is secured properly to the machine
frame .
q
9 . This completes the replacement of the
control . Proceed to the Start-Up Section on
page 9 for set up and programming .
First Time New Installation of CBPC-3590
Control
Refer to the dimensional diagram, Figure 1 for
actual mounting dimensions .
q
1. Select the location where the control will be
mounted. Insure that mounting will not
interfere with anything else and that wiring
access will not be impeded.
q
2 . Using the dimensional information from the
diagram below, drill 4 mounting holes to
accept ¼-20 studs from the vibration
mounts for attaching the controller to
the machine frame .
q
3 . Depending on the type of vibration
isolator mounts used, male to male or
male to female, attach one end of the
mount to the machine frame at all 4
points .
8.250
5 Pin Socket
(Encoder)
Optional Hole
(Aux. Wiring)
9 Pin Socket
(CI-Bk/Power)
10.500
1.850
1.400
4.125
7.000
11.500
0.700
4.275
Figure 1
Dimensional Diagram