Vanguard TRM-203_403 User Manual
Page 64

TRM-203 AND TRM-403 USER’S MANUAL
REV 1
60
After the TRM has finished its internal calibration, the following screen will be displayed:
When the TRM has determined that the resistance reading is stable, the following
screen will be displayed:
Press the
[ENTER]
key or the LTC
[RAISE]
or
[LOWER]
key to continue.
h. The following screen will be displayed:
Press the
[1]
key (LATCHED).
i. The TRM will start capturing data and the following screen will be displayed:
The second line on the screen will display the remaining time for the test. While the
TRM captures data, you can press the LTC
[RAISE]
or
[LOWER]
button to cycle
through the LTC or Voltage Regulator’s taps. You can wait for the remainder of the test
time or you can press the
[STOP]
key at any time to end the test. If you have
RUNNING DYNAMIC
LTC TEST T=239
"STOP" TO END TEST
** XFMR ENERGIZED! **
TAP SWITCH OPERATION:
1.
LATCHED
2.
MOMENTARY
PRESS "ENTER" 00:01
OR LTC RAISE/LOWER
TO START TIMING...
I = 9.98 AMPS
*XFMR CHARGING*
please wait...
I = 1.90 AMPS
** XFMR ENERGIZED! **