No ne on e tw o thr ee, None on e tw o thr ee, Figure 3: typical mounting hole locations – System Sensor SC-6 User Manual
Page 2: Figure 4: mounting the ch-6 chassis, Figure 1: ch-6 chassis figure 2: bb-2 cabinet

FIGURE 3: TYPICAL MOUNTING hOLE LOCATIONS
BACKBOX
MOUNTING
HOLES
FIGURE 4: MOUNTING ThE Ch-6 ChASSIS
MOUNT WITH
SELF-THREADING SCREWS
TO BACK OF CABINET
The BB-2 cabinet comes with the chassis already installed, so no mounting
is necessary.
3. Module Installation
There are two methods for installing a module in the rear position of a
chassis. Method one is for installation of a rear module only, when no
module will be installed in front of it. Refer to Figure 5 for instructions.
Method two is for installation of a rear module when another module
will be installed in the chassis position in front of it. Refer to Figures 6a
and 6b for method two. All necessary screws and standoffs are supplied
with the modules.
FIGURE 5: INSTALLATION OF REAR MODULE ONLY, METhOD ONE
2
3
1
Step 1: Insert the bottom of the SC-6 module down into a rear slot on the
chassis.
Step 2: Carefully swing the upper edge of the board back towards the back of
the chassis until it touches the two standoffs.
Step 3: Align two 4-40 screws with the two standoffs and tighten.
Step 4: Address and wire the modules according to the instructions in this
manual.
COMPATIBILITY REqUIREMENTS
To ensure proper operation, this module shall be connected to a listed compat-
ible control panel.
COMPONENTS
Following are descriptions of the SC-6 mounting frameworks. There are two
mounting options for SC-6 modules:
• Up to six SC-6 modules can be installed on a CH-6 in a BB-6 cabinet.
• One or two SC-6 modules can be installed in a BB-2 cabinet.
ChASSIS
The CH-6 chassis is used to mount SC-6 modules in a BB-6 cabinet. It accom-
modates up to six SC-6 modules in a single cabinet row three modules wide
and two modules deep.
The BB-2 cabinet has a built-in chassis that will accommodate one or two
SC-6 modules.
C0206-00
D500-50-00 2 I56-1802-012
C0235-00
C0236-00
C0234-00
FIGURE 1: Ch-6 ChASSIS
FIGURE 2: BB-2 CABINET
0
1
2 3 4 5 6
7
8
9
0
7
8
65
4
3
2
1
91
0
1112
13
14
15
BA
SE
A
D
D
R
ES
S
AD
D
R
ES
S
D
IS
AB
LE
NO
NE
ON
E
TW
O
THR
EE
0
1
2 3 4 5 6
7
8
9
0
7
8
65
4
3
2
1
91
0
1112
13
14
15
BA
SE
A
DDRE
SS
ADD
R
ES
S
DI
SA
BL
E
NONE
ON
E
TW
O
THR
EE
The front SC-6 module positions of each chassis are offset below the rear SC-6
module positions so that all of the status indicators are visible.
CABINETS
A BB-6 cabinet will house the CH-6 chassis with up to six SC-6 modules in-
stalled on it. Refer to cabinet installation documents for dimensions.
The BB-2 cabinet houses one or two SC-6 modules on the internal chassis that
is part of the cabinet. Refer to cabinet installation documents for dimensions.
INSTALLATION STEPS
1. Cabinet Mounting
In a clean, dry area, mount the backbox using the four holes provided in
the back surface of the cabinet (Figure 3).
2. Chassis Installation
The CH-6 chassis is mounted in the BB-6 cabinet. It is shipped with two
self-threading screws, which are used to fasten the chassis to the back
wall of the cabinet (see Figure 4).