Installation steps, Figure 4. mounting the ch-6 chassis, Compatibility requirements – System Sensor CZ-6 User Manual
Page 2: Components, Figure 1. ch-6 chassis, Figure 2: bb-2 cabinet

Cabinets
A BB-6 cabinet will house the CH-6 chassis with up to six CZ-6
modules installed on it. Refer to cabinet installation documents
for dimensions.
The BB-2 cabinet houses one or two CZ-6 modules on the internal
chassis that is part of the cabinet. Refer to cabinet installation
documents for dimensions.
INSTALLATION STEPS
1. Cabinet Mounting
In a clean, dry area, mount the backbox using the four holes
provided in the back surface of the cabinet (Figure 3).
2. Chassis Installation
The CH-6 chassis is mounted in the BB-6 cabinet. It is shipped
with two self-threading screws, which are used to fasten the
chassis to the back wall of the cabinet. (Figure 4).
Figure 3. Typical mounting hole locations:
Backbox
Mounting
Holes
Figure 4. Mounting the CH-6 chassis:
Mount with self-threading screws
to back of cabinet
The BB-2 cabinet comes with the chassis already installed, so
no mounting is necessary.
3. Module Installation
There are two methods for installing a module in the rear posi-
tion of a chassis. Method one is for installation of a rear mod-
ule only, when no module will be installed in front of it. Refer
to Figure 5 for instructions. Method two is for installation of
a rear module when another module will be installed in the
chassis position in front of it. Refer to Figures 6a and 6b for
method two. All necessary screws and standoffs are supplied
with the modules.
Figure 5. Installation of rear module only, method one:
2
3
1
Included:
(5) 1 x 4 Terminal Blocks (2) 1
1
/
4
” Stand offs (3) Shunts
(4) Machine Screws (2) Nuts (1) Long Power Supply Jumper
(6) 3.9k Ohm
End of Line Resistors
Shipped on Board:
(2) Shunts in Class A/B position
(Shipped in Class B position, remove shunts for Class A)
COMPATIBILITY REQUIREMENTS
To ensure proper operation, this module shall be connected to a
compatible system control panel. Contact System Sensor for a list
of compatible detectors.
COMPONENTS
Following are descriptions of the CZ-6 mounting frameworks.
There are two mounting options for CZ-6 modules:
• Up to six CZ-6 modules can be installed on a CH-6 in a BB-6 cabinet
• One or two CZ-6 modules can be installed in a BB-2 cabinet
Chassis
The CH-6 chassis is used to mount CZ-6 modules in a BB-6, cabi-
net. It accommodates up to six CZ-6 modules in a single cabinet
row three modules wide and two modules deep.
Figure 1. CH-6 Chassis:
The BB-2 cabinet has a built-in chassis that will accommodate
one or two CZ-6 modules.
Figure 2: BB-2 Cabinet
0
1
2 3 4 5 6
7
8
9
0
7
8
65
4
3
2
1
9
10
11
12
13
14
15
BASE
ADDRESS
ADDRESS
DISABLE
NO
NE
ON
E
TW
O
TH
RE
E
0
1
2 3 4 5 6
7
8
9
0
7
8
65
4
3
2
1
9
10
11
12
13
14
15
BASE
ADDRESS
ADDRESS
DISABLE
NONE
ONE
TW
O
THREE
The front CZ-6 module positions of each chassis are offset below the rear
CZ-6 module positions so that all of the status indicators are visible.
D500-49-00
2
I56-1799-005
C0202-00
C0206-00
C0234-00
C0237-00
C0236-00
C0235-00