Harrington Hoists and Cranes (N)ER Load Limiter - ((N)ER2) User Manual
Page 13

13
Figure 3-4 Installation location of LL (3 and 5 Ton)
3.2 Socket Frame holder and Load Limit Relay
3.2.1
The Socket Frame Holder L mounts between the Socket Frame Complete Set and the Gear Case. Refer
to Figures 3-5 and install as follows:
1) Remove the Socket Frame Complete Set with 4 & 8 Pin Socket Assemblies by:
a) Disconnecting the leads coming from the both Socket assemblies.
b) Remove the socket frame mounting screws.
2) Install the Socket Frame Holder L and the Socket Frame Complete Set supplied with the Load Limiter
Kit. This Socket Frame Complete Set has longer leads required to make the electrical connections. Be
sure to place the packing/gaskets between the Gear Case and Socket Frame Holder L, and between
the Socket Frame Holder L and Socket Frame Complete Set.
3) Attach the LL cable to the Socket Frame Holder L. Refer to Figure 3-6.