Installation, Ransburg, Color valve stack - installation – Ransburg Color Valve Stack CCV-5100 User Manual
Page 12
INSTALLATION
Figure 1: Typical Color Change Stack
* Included in KK-4901 Manifold Assembly Kit.
LSFI0033 Adapter
9
Color Valve Stack - Installation
LN-9113-06.3
Ransburg
The CCV-403-SS valve mounted at this position is used
for solvent flushing of the manifold assembly. Connect the
solvent feed line to this valve. (Check valve is always used
on input port of CCV).
Check valves are always used on input ports of Air Push and
Solvent CCV’s They are optional for Color CCV’s.
GA-338 Gauge
HAR-503-1 Air Regulator
23165-430* O-Ring (not shown)
The CCV-403-SS valve
mounted at this position is
used for air push of the man-
ifold assembly. Connect the
main air line to the regulator.
(Check valve is always used
on input port of CCV.)
CCV-16-SS Manifold Block
SSF-6504* Threaded rod - 4 required.
Cut to proper length at assembly.
SS-655-ZN* Nut - 4
required. (tighten to
110-130 in lbs)
CCV-37 Manifold
Mounting Bracket - 2
required
CCV-18-SS
Open Manifold End Cap
Fluid Inlets -
Fittings must
be specified on Standard
Stacks. Tee fittings (SSP-
6810, 3/8” Male Branch Tee)
or 3/8” Elbows (SSP-6435)
may be used. Plug opposite
port with SSP-1421 Pipe
Plug if necessary.
Use nylon tubing for all fluid
lines, 1/4” O.D. or larger.
Do not use polyethylene
for fluid.
SS-10022* Cap Screw (4) required
CCV-17-SS End Valve Manifold Block
NOTE: