Assembly Instructions:
STEP 1: Unpack all parts from shipping carton to ensure no parts are missing. Refer to the exploded view.
STEP 2: Install the four (#9) 7/8” Tube plugs onto the ends of the two (#15) Frames with the help of a hammer
or some other tool.
STEP 3: Determine whether to mount on the front or the back luggage rack. Depending on whether the M20
is mounted to the front or rear rack, you will need to install (#4) Control assembly to either the right (#11) or
left (#15) Frame tube to allow for use with the non-throttle hand. Wait until the unit is mounted to the Quad
before installing the Control.
STEP 4: Next install four 1/4-20 x 1-1/2” Carriage bolts (#12) through the Hopper assembly and then through
ONE of either side Frame and secure with 1/4-20 Hex Nut (#8).
STEP 5: Now position the M20 to the Quad and install the
remaining Frame member as outline above in STEP 4. Now
install the Control assembly (#4) to the Frame and secure
with a 1/4-20 x 1-3/4” Carriage bolt (#13) and 1/4-20 Hex
Nut (#8) and tighten firmly to allow movement, but not
allow the lever to move unassisted.
Now install the M20 on your quad as outlined on the
following page.
STEP 2:
STEP 3: Determine where to mount
STEP 4:
STEP 5: