beautypg.com

Page 4 – Earthway 2170T Commercial Tow Broadcast Spreader User Manual

Page 4

background image

GAUGE & LEVER

ASSEMBLY

Control Rod

Tabbed Hole

Control Rod

Lever Tensioning Nut

Gauge Setting

Overlay

14. Install (1) 1/4-20 regular nut (not a locknut)

on to control rod as shown.

15. Install flattened end of control rod in to lever on gauge as shown. Turn to lock in

place. Next push lever forward to setting “0”. Align control rod with hole in pivot

bracket, pull lever backward to insert control rod through hole in pivot bracket. Now

install 1/4-20 regular nut on to control rod.

16. Pull lever back to setting “30” as shown. Next push pivot & bracket forward

so that the shut off plate in the hopper is in the full open position. REMEMBER

SETTING “30” ON THE FLOW CONTROL LEVER MUST PLACE THE

SHUT-OFF PLATE IN THE FULL OPEN POSITION TO BE PROPERLY

CALIBRATED. Now tighten the nuts against the pivot bracket to prevent change in

calibration.

17. Tension on the flow control lever may be adjusted by tightening or loosening the

tension nut as shown.

¼-20

Hex Nuts

Pivot

Bracket

Control

Rod

Pivot

Rod

18. Insert agitator to pinion shaft on inside of hopper.

Note: the position of flat side of the agitator. This pin

should be installed as shown.

PAGE 4

1/4-20 x 1”

Hex Head Bolt

Stainless

1/4-20 Lock Nut

Stainless

19.

Install debris screen into hopper, then insert 1/4-20 x 1”

Stainless Steel Hex Bolt thru the hole in the side wall of the

hopper. Secure with Stainless Steel lock nut - TIGHTEN

WITH HAND TOOLS ONLY