0 meter technical specifications – E-Mon E20-6003200J-G-KIT User Manual
Page 36
GREEN CLASS METER
62-0415-01
36
A. Yes. Simply run all the breaker wires through one set of current sensors. Make sure
all A phase circuits are run through the A phase sensor, and the same for B & C
phases. The meter should be sized by the highest amount of current being monitored
by one sensor.
Q. I’ve gone through the troubleshooting guides and I still can’t get my meter to work.
What should I do?
A. Before removing the unit, contact E-Mon’s technical support department at (800)
334-3666. Our technical support experts will assist you in detailed troubleshooting of
the meter installation and assist you in getting the meter functional without having to
remove and return the unit.
12.0 METER TECHNICAL SPECIFICATIONS
Ordering Information: Define brand, class, input voltage, current sensor amperage,
enclosure type, and sensor type in the format A-BB-CCC-DDDD-E-F-GGG where:
A = Brand: E for E-Mon
BB = Class: 20 for Green Class
CCC = Input Voltage: 120, 208, 480 or 600
DDDD = Amperage: 100, 200,400,800,1600, or 3200
E = Enclosure Type: J = standard metal, R= 4X raintite, M = MMU
F= Meter Option: D for Demand, G for Green Meter, “blank” for kWh meter
GGG = sensor type: KIT = split-core, SCS= solid core “blank” = none supplied
EXAMPLE:
E
G
20
480
100 J
KIT
E-MON
GREEN METER
CLASS 2000 METER
INPUT VOLTAGE (480V)
AMPERAGE (100 AMPS)
ENCLOSURE TYPE (STANDARD METAL)
SENSOR TYPE (SPLIT-CORE)
- E20-6001600J-G-KIT E20-600800-J-G-KIT E20-600400-J-G-KIT E20-600200-J-G-KIT E20-600100-J-G-KIT E20-4803200J-G-KIT E20-4801600J-G-KIT E20-480800-J-G-KIT E20-480400-J-G-KIT E20-480200-J-G-KIT E20-480100-J-G-KIT E20-2083200J-G-KIT E20-2081600J-G-KIT E20-208800-J-G-KIT E20-208400-J-G-KIT E20-208200-J-G-KIT E20-208100-J-G-KIT