Dixon Valve 15 TON RAM Internal Expanded Holedall Petroleum User Manual
Page 4

4
Dixon Valve & Coupling Co., Call 1-800-355-1991
15 Ton Ram IX 8/06
Holding the hose and ferrule firmly against the
stem shoulder and, maintaining the proper
“pocket”, engage the Ram by stepping on the foot
pedal. The internal expansion operation is
complete when the hose and stem assembly is
pushed completely over the internal expansion
plug. Release the foot pedal. Visually inspect the
coupling.
Note: If the gauge reads 10,000 PSI before internal
expansion is complete, stop. Contact Dixon for
further assistance. During internal expansion
never stand directly in front of the Ram.
Note: For internal expansion of Holedall Carbon Steel and Stainless Steel couplings, please refer to the
Internal Expansion instructions for the 15-Ton Ram using Carbon Steel and Stainless Steel Couplings.
Important! It is a prudent practice to test every length of hose after assembly and Dixon Valve & Coupling
Company recommends this as a standard practice as recommended by the Rubber Manufacturers Association.
Ensuring that the end of the ferrule is aligned with the
mark from Step 6, slide the hose with ferrule over the
shank until the ferrule contacts the shoulder of the stem.
Check to see if the proper pocket is maintained.
IMPORTANT! If there is incorrect “pocket” for the
rubber to displace into, damage may occur to the stem,
ferrule or both, which could result in coupling failure.
7
8