Hanging pre-assembled unit – Detroit Radiant Products Company QTS Series User Manual
Page 16
QTS
Series
16
3.0
Installation
•
Hanging Pre-Assembled Unit
1
Raise the assembled unit from assembly station to prepared hanging location.
NOTE: This can be
done manually or with a winch system.
2
Attach two chains to exchanger connection hanging bracket (TP-6079). Secure S-hooks.
3
Attach the third chain located furthest from the gas and electrical connections to the reflector end
assembly (TP-6089A) and secure S-hook.
4
Raise or lower the unit to desired mounting height.
Hanging Pre-Assembled Unit
Figure 3.6
•
Hanging the Heater