beautypg.com

Preparing points for hanging – Detroit Radiant Products Company QTS Series User Manual

Page 15

background image

QTS

Series

15

3.0

Installation

Preparing Points for Hanging

Hanging Types

1

Transfer the heater’s three hanging locations to the ceiling where the unit is to be installed and mark

hanging points.

2

Prepare mounting surface. If necessary attach additional support blocks and drill holes (Figure 3.5).

3

Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.

4

Attach and close S-hook (P/N: S-HOOK) and #1 double-loop chain (P/N: THCS) to anchor. Check

that it is securely attached.

NOTE: Threaded rod and turnbuckles may be used.

NOTE: The unit must be in straight alignment and level. Adjust chain lengths until radiant tubing is level
and equal weight distribution is achieved. Chains must be straight up and down. Do not install chains at
an angle as this can result in tube warpage or separation.

Preparing Points for Hanging

Figure 3.5

Hanging Types

Wood

Beam

I-Beam

I-Beam

Concrete

Beam

Support

Blocking

Support

Blocking

Screw Hook

S-Hook and #1

Double-Loop Chain

Beam Clamp

S-Hook and #1

Double-Loop Chain

Beam Clamp

Threaded Rod and

Turnbuckle

Turnbuckle