Detroit Radiant Products Company DET3 Series User Manual
Page 11
11
DET3
Series
2.0
Installation
•
Tube Sequence
•
Heater Length
Key
20 Foot
50 Foot
60 Foot
30 Foot
40 Foot
Figure 2.4
•
Tube Installation Sequence
Standard Tube Clamp
Stainless Steel Tube
Clamp (P/N: TP-220)
175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.
NOTE: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.
Important! The combustion chamber(s) & radiant tube section(s) must be installed in the following order.
Baffle Location
Burner Control Box with
16” Burner Tube
Primary Combustion
Chamber Tube
Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)
Hot-rolled Steel Radiant
Emitter Tube
Stainless steel clamp location on 175-200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Stainless steel clamp location on 175 - 200 MBH models (P/N: TP-220).
Aluminized steel secondary combustion chamber location on 150-200 MBH models.
Aluminized steel secondary combustion chamber location on 150-200 MBH models.