beautypg.com

Detroit Radiant Products Company DET3 Series User Manual

Page 11

background image

11

DET3

Series

2.0

Installation

Tube Sequence

Heater Length

Key

20 Foot

50 Foot

60 Foot

30 Foot

40 Foot

Figure 2.4

Tube Installation Sequence

Standard Tube Clamp

Stainless Steel Tube
Clamp (P/N: TP-220)

175-200 MBH models only - Located
between 1st and 2nd 10 ft. tube sections.

NOTE: Refer to the Tube Heater General Manual, Chart 3.6 (page 23) for secured reflector joints.

Important! The combustion chamber(s) & radiant tube section(s) must be installed in the following order.

Baffle Location

Burner Control Box with
16” Burner Tube

Primary Combustion
Chamber Tube

Secondary Aluminized Steel
Combustion Chamber
(150-200 MBH models only)

Hot-rolled Steel Radiant
Emitter Tube

Stainless steel clamp location on 175-200 MBH models (P/N: TP-220).

Aluminized steel secondary combustion chamber location on 150-200 MBH models.

Stainless steel clamp location on 175 - 200 MBH models (P/N: TP-220).

Aluminized steel secondary combustion chamber location on 150-200 MBH models.

Aluminized steel secondary combustion chamber location on 150-200 MBH models.