Micromod Micro-DCI: 53MC5000 MicroLink User Manual
Page 16

A00 - A23 SUP00.A00 - SUP00.A23
A24 - A431 SDT00.A00 - SDT23.A16
A432 - A611 CON00.A00 - CON89.A01
A612 - A635 PAR00.A00 - PAR23.A00
❊
The mapping shown above applies to a Revision 4.1 or higher SUPERVISOR board.
The mapping in a Revision 4 SUPERVISOR board is:
L100 - L355 PLC00.L00 - PLC00.L255
L356 - L611 PLC01.L00 - PLC01.L255
For example, the F-TRAN statement (assumes INS01 is a SUPERVISOR-PC unit)
PLC00.L00 = INS01.L104 ;
copies the template PLC00’s L00 bit from instrument 01 to the PLC00.L00 bit at the node executing
the F-TRAN statement.
4.3.2 PARAMETER ENTRIES FOR PC UNITS WITH THE 53WS5000 PRODUCT
PACKAGE INSTALLED
Refer to IB 53WS5000 sub-section 2.5.7.3 to set parameters B01 (MicroLink Address 0 - 31) and
B02 (MicroLink Mode). The MicroLink SUPERVISOR card in the PC unit requires a unique Mi-
croLink Address 0 - 31 (parameter B01) that is not assigned to any other node on the network. Mi-
croLink Mode (parameter B02) options are used to select the data rate as follows: Mode 1 = 1
Mbit/s, Mode 2 = 0.5 Mbit/s, and Mode 3 = 0.25 Mbit/s. Mode 0 (2 Mbit/s) can not be selected.
4.3.3 PROCESS CONTROL STATION PARAMETER ENTRIES
Refer to IB 53MC5000 for a description of data entry methods.
To set up a Process Control Station for MicroLink operation:
1. Set PCS database location B01 to its assigned Instrument Address (0 - 31). Each instru-
ment on the network must have a unique address that is not already assigned to another
PCS, SUPERVISOR-PC unit, or PC unit with the 53WS5000 product package installed.
2. Set PCS database location B448 to the MicroLink mode (0, 1, 2, or 3). All nodes on the
network must have the same mode selected. Mode 0 can not be used if a SUPERVISOR-
PC unit or a PC unit with the 53WS5000 product package installed is on the network.
3. Select the desired peer-to-peer tasks as described in IB 53MC5000.