Shut down the instrument, Technical support, On the web – Luminex xPONENT 4.2 for FLEXMAP 3D User Manual
Page 19
2. Select the Current Batch or Saved Batches tab.
3. If you want to open a saved batch, highlight the batch and click Open.
Shut Down the Instrument
Run the daily shutdown routine to prevent clogs and crystallization of salt in the sample
probe. Clogs and crystallization of salt in the sample probe may cause problems with
calibration, verification, and data acquisition; they may also cause sample splashing. Shut
down the system properly to ensure system integrity.
1. On the Home page, click Shutdown. The Auto Maint tab opens, with System
Shutdown selected.
2. Fill the labelled area of the off-plate reagent block (RB2) with a 10-20% household
bleach and water solution.
3. Add deionized water to the labelled area of the off-plate reagent block (RA1).
4. Click Run.
Technical Support
On the Web
For more information, visit the Luminex FAQ page at http://www.luminexcorp.com/support/.
You can access the Technical Support website using a user name and password at https://
esupport.luminexcorp.com/OA_HTML/jtflogin.jsp.
15