Daily shut-down checklist – Magnum Venus Plastech RT-3000 PRO GUN CHOP TRIGGER User Manual
Page 25
RT-3000 Remote Trigger Manual
Rev. 12/2012
Page | 25
Daily Shut-Down Checklist
ACTIVITIES MUST BE DONE IN THE SEQUENCE SHOWN, AND MUST BE CHECKED OFF
AS COMPLETED. USE THIS CHECKLIST IN CONJUNCTION WITH THE OPERATING
MANUAL FOR THE ULTRAMAX UNIT.
Priority: Put on Respirator as specified for spray painting, Protective Clothing, Eye
Protection, and PVC Gloves
1
Flush the gun with solvent.
2
Wipe the face of the nozzle after flushing.
3
Turn off the main inlet air ball valve at the manifold.
4
Release the solvent flush tank pressure.
5
Remove the nozzle and clean it.
6
Remove the Mix Housing and clean it.
7
Wipe the gun block face with a clean rag.
8
Hang the gun with the gun block exit holes facing down.
9
Open the catalyst recirculation valve on the catalyst manifold
10 Open the resin dump valve located on the bottom of the resin filter.
THE UNIT IS NOW READY.
ABNORMAL CONDITIONS OBSERVED AND CORRECTED
Abnormal Condition
a
a
a
a when
corrected
OPERATORS NAME: _______________________________________ DATE: ________________
SIGN OFF WHEN START UP CHECKS ARE COMPLETED: __________________________