*Confirm that the gate operator being installed is appropriate for the application.

*Confirm that the gate is designed and built according to current published industry standards.

*Confirm that all appropriate safety features and safety accessory devices are being incorporated, including both primary and secondary
entrapment protection devices.

*Make sure that the gate works freely before installing the operator.

*Repair or service worn or damaged gate hardware before installation of the operator.

*Eliminate all gaps in a sliding gate below a 4 foot height that permits a 2 ¼ inch sphere to pass through any location, including the area
of the adjacent fence covered when the gate is in the open position.

*Eliminate all gaps in a swinging gate below a 4 foot height that permit a 4 inch sphere to pass through any location, including the hinge
area of the gate.

*Operator must be disconnected from the power source before attempting any installation of accessories.

*Install this gate operator according to our installation instructions.

*Adjust the operator clutch or load sensing device to the minimum force setting that will still allow for reliable gate operation.

*Install the operator inside the fence line(do not install the operator on the public side of fence line).

*Install a proper electrical ground to a gate operator.

*Install controls where users cannot touch or reach through the gate to operate the controls.

*Install all warning signs and take pictures of the installation.

*Test all safety features for proper function before placing the automatic vehicular gate into service.

*Train owner/users about basic functions and safety features of the gate system, including how to turn off the power and how to operate
the manual disconnect feature.

*Leave safety instructions, product literature, installation manual and maintenance manual with end user.

*Explain to the owner/user the importance of routine service and retesting on a monthly basis.