beautypg.com

94 mm, Preparing the foundation box – CAME Frog-PM User Manual

Page 7

background image

500

650

500

94 mm

24h

P.

77

-

M

an

u

al

c

od

e:

11

9

A

V

7

0

11

9

A

V

7

0

ve

r.

1

.0

1.

0

03

/2

0

11

© C

A

M

E c

an

ce

lli

auto

m

ati

ci

s.p.a. - T

h

e d

ata a

n

d i

nf

or

m

ati

on i

n th

is

m

an

u

al

m

ay b

e c

h

an

g

ed at a

ny ti

m

e a

n

d w

ith

ou

t o

b

lig

ati

on

o

n th

e p

art of C

am

e C

an

ce

lli

A

uto

m

ati

ci

S

.p.a. to n

otify s

ai

d c

h

an

g

es.

ENGLISH

Preparing the foundation box

The following illustrations are also shown in the manual of the Frog-PC packaging, some exampels are shown, becasue

the space for fastening the operator and accessories depends on the dimensions.It is up to the installer to choose the most
suited solution.

Dig a pit to house the box, set up junction boxes with the corrugated tubes required to thread connections coming from

N.B. the number of tubes depends on the type of installation and accessories used.

Fill the pit with cement.
Sink the box and position it against and fl ush with the gate post, making sure the corrugated and drainage tubes can pass throught
their holes.

Level the box with the ground and position the box pin so it is aligned with the
upper hinge of the gate and at least 94 mm from the gate post.Leave to set for at
least 24 hours.
Clean away any cement residues from inside the box.