5

A-Side

Z-Side

Rx

Tx

Out

In

MON

DSX-1

Digital Switch

Remote Terminal

D Shelf

C Shelf

B Shelf

A Shelf

T-BERD Outside Plant Tester

DLC Analyzer

SLC-96 datalink monitor

The T-BERD Outside Plant Tester can

capture major and minor shelf alarms,

far-end loopback, line protection

switches, and maintenance events in

both directions for nonintrusive,

in-service verification.

SLC-96 datalink emulation

The user can verify central office switch

and terminal response to alarms, far-end

loopbacks, and line protection switches

as well as execute test pair maintenance

requests during system installation

and in-service maintenance.

Two-Wire VF input/output

The T-BERD Outside Plant Tester allows

a butt-set to be connected for DTMF digit

transmission, call placement, and talk

path for subscriber maintenance and

PBX applications.

SLC-96 Mode 2 configuration timeslot

assignment results

The T-BERD Outside Plant Tester can

determine channel and timeslot assign-

ment for systems configured for SLC-96

Mode2 concentrated applications.

Please refer to figure 4.

figure 2 Measure total length of the loop, including bridged taps,

to verify that it meets CSA standards

figure 4 Ensure remote terminal operations, verify voice-grade service,

and validate signaling transmissions during system qualifications

CO

CPE

T-BERD Outside Plant Tester

CO

CPE

T-BERD Outside Plant Tester

T-BERD Outside Plant Tester

figure 3 Measure signal loss to qualify loop integrity prior to circuit turn-up