beautypg.com

Alpha Technologies Battery Racks User Manual

Page 13

background image

13

3.3 Install the batteries onto the racks.

Note:

When installing the batteries leave a 10mm spacing between cells to accommodate the
fixing rods during the seismic hardware installation.





3.4 Layout the battery hold-down angle bars to verify installation position
















3.5 Position the hold-down angle bars onto the batteries. Align the fixing rods with the

holes and hook the rod under the outside rail.












Outside rail

Fixing rod

Holes are spaced differently
on each side.

Battery width + 10mm