3 sample input power panels, Sample input power panels, Installation – Alpha Technologies PN-4 User Manual
Page 19: Primary service

3. Installation
19
031-103-B0-003 Rev. C
© 2002
TM
Neutral
Lightning
Protection
Service
Main
Line 1
Line 2
15A
15A
15A
50A
Grounding
Electrode
Conductor
BBX-100A-8POS
IPP-240-3
240V/15A
240V/15A
120V/15A
GFCI
240V/15A
Service and
Distribution
Load
From
Service
Supply
Main Bonding Jumper
G
N
Primary Service:
1) Main Bonding Jumper is Installed.
2) Grounding Electrode Conductor is Installed.
3) Lightning Protection is bonded outside of cabinet.
IPP-120-3
120V/20A
120V/20A
120V/20A
120V/15A
GFCI
Neutral
Lightning
Protection
Line 1
Line 2
15A
20A
20A
50A
Grounding
Electrode
Conductor
BBX-100A-8POS
20A
Service
Main
Service and
Distribution
Load
From
Service
Supply
Main Bonding Jumper
G
N
Primary Service:
1) Main Bonding Jumper is Installed.
2) Grounding Electrode Conductor is Installed.
3) Lightning Protection is bonded outside of cabinet.
3.3.3
Sample Input Power Panels
For more information on available models of the Input Power Panel, refer to "PN Series Options", section 4.4.
Figure 3-4; Schematic: Primary Service BBX-100A-8POS with IPP-240-3
Figure 3-5; Schematic: Primary Service BBX-100A-8POS with IPP-120-3