5.0

Turn-up and Test, continued
5.4

Generator System Sensor Verification, continued

5.4.2 AC and DC Line Sense Verification

The ECM monitors the AC line and DC bus status to determine when to start and

stop the APU. In the event of an extended power outage or low battery bus voltage

the ECM will start the APU. The following test verifies these functions.

1. Verify the ECM RAS switch is in the AUTO position, the APU is not running, and

there are no major or minor alarms reported other than the Tamper alarm.

2. Place the Output Circuit Breaker in the OFF position.

3. ECM reports a minor DC Bus Fault alarm.

4. Verify the APU starts and alarm clears. Return the Output Circuit Breaker to the

ON position.

5. After the ECM verifies 53Vdc (or greater) the generator will run for a12-minute

cooldown period and shut down

6. Remove the AC Utility Line sense cable from the front of the ECM.

7. Verify the ECM reports a Line Failure notification and the APU starts running after

a three minute time delay.

8. Replace the AC Utility Line sense cable and verify the notification clears.

9. Verify the APU stops running after the 12-minute cooldown period