7

Mortar Bed

Sub-floor

Waterproofing

Membrane

Mortar Bed

Sub-floor

Waterproofing

Membrane

Before finishing material • Antes que el material esté terminado

Tile

Assure that

grate is

lower than

installed tile

Tile

Assure that

grate is

lower than

installed tile

After finishing material • Después que el material esté terminado

6. Place finished top grate (A) into the

installed bottom channel (C). Use adjustable

feet (B) to raise or lower the top grate to be

1/16” below the finishing material height.

6. Coloque la rejilla superior (A) en la parte

inferior del canal instalado (C). Utilicé ajustables

pies para levantar o bajar la rejilla a ser 1/16”

debajo de la altura del material terminado.

Model

Minimum

Height

Maximum

Height

FFED25/FFED65/

FFDG25/FFDG65/

FFMN25/FFMN65/

FFAS25/FFAS65/FFAS125

11/₁₆”

19/₁₆”

FFTIF 65

1³/₁₆”

111/₁₆”

Model

Minimum

Height

Maximum

Height

FTED25/FTED65/FTDG25/

FTDG65/FTMN25/

FTMN65/FTAS25/FTAS65/

FTAS125

11/₁₆”

19/₁₆”

FTTIF 65

1³/₁₆”

111/₁₆”

(B) Adjustable Feet

Grate can be raised an

additional ½”

(B) Adjustable Feet

Grate can be raised an

additional ½”

7. FFTIF 65/FTTIF 65 INSTALL. Spread a layer

of mortar into the Tile Insert Frame (TA65),

allowing for thinset and and finishing material

to finish 1/16” above the metal frame. Allow to

dry, spread thinset and lay material.

7. FFTIF 65/FTTIF 65 INSTALACION. Extender

una capa de mortero en Tile Insert Frame

(TA65), permitiendo el thinset y material

terminado que termine 1/16” arriba del marco

del metal. Permita que se seque, extienda