beautypg.com

Vent terminal installation procedure – John Wood Noritz N-069M-DV User Manual

Page 63

background image

63

1) Determine the vent terminal installation

location and make a 6.3" diameter hole.
Install the sleeve into the hole with the
triangular mark ( ) pointing up. Use the
wall anchors and rounded wood screws.

4.

Vent Terminal Installation Procedure

* When drilling, take care not to damage electric

wiring, or gas or water piping in walls.

6.85

5.6

5.6

6.85

Screw holes (4)

(0.3"diameter and
1.4"to 1.6"depth).

Triangular mark ( )

Before installing the sleeve, adjust its length to fit the
wall thickness.
(The length can be adjusted in increments of 0.4".)

Waterproof the clearance between the sleeve
and wall hole with a high temperature sealant.

2) Attach the wall flange to the sleeve.

Sleeve

Wall flange

Tapping screw

Terminal Orientation Flange Orientation

Outlet Orientation

(1)

The terminal cannot be installed in this
orientation.

Sleeve

Waterproof the
clearance with a high
temperature sealant.

Rounded wood screw (short)

Sleeve

Wall anchor

6.3" dia.

Waterproof the clearance with
a high temperature sealant.

Rounded wood
screw (long)

(2)

(4)

(3)

Up

Down

Up

Down

Top

Bottom

Correct

Correct

Incorrect

Incorrect

Intake

Exhaust

Intake

Exhaust

Up

Down

Up

Down

Intake

Exhaust

Intake

Exhaust

6.9"

8.3"

6.9"

8.3"

6.9"

8.3"

* The proper flange orientation

depends on the desired
orientation of the vent terminal.

* Unless the vent terminal is

installed as in option (1) in the
chart to the right, the outlet will
need to be adjusted in order to
ensure it is oriented in the proper
direction.

Remove this screw
and slide out the
external cylinder.

Slide out the external cylinder
until it is flush with the external
wall and replace screw.

SAR8192-2_060_067_E_J.p65

05.11.29, 9:01 PM

Page 63

Adobe PageMaker 6.5J/PPC