beautypg.com

John Wood Noritz N-069M-DV User Manual

Page 44

background image

44

• Do not store hazardous or flammable sub-

stances near the vent terminal,

• Slope the intake and exhaust pipes at a 1/50

grade down towards the termination.

• Use only UL listed Category III venting products.
• Connect the vent pipe firmly so that it will prevent

exhaust gases from leaking.

• Steam or condensed water may drip out of the

vent terminal.Dispose of this condensed water
according to local codes and in order to prevent
injury or property damage.

• If this product will be installed in an area where

snow is known to accumulate,protect the vent
termination from blockage by snow drifts or dam-
age from snow falling off of roofs.

• Support the vent pipe with hangers at intervals

as required by the vent pipe manufacturer ’s in-
stallation instructions.

• Install the vent terminal so that it is easily

accesible for maintenance both from the indoors
and the outdoors.

• If the vent terminal will be installed higher than

the water heater,make the vertical section di-
rectly above the water heater as short as
possible,and slope down to the terminal. Do not
have another vertical section after the horizontal
section begins.

• Make the vertical pipe as short as possible.

Venting Precautions

• Use 4" diameter Category III vent pipe.
• Maximum vent length

• Exceeding the maximum vent length is danger-

ous and may result in bad combustion.

• If possible,don ’t install the vent pipe through any

enclosed areas.If necessary,consult the pipe
manufacturer ’s instructions for clearances.

• Install the vent terminal so that all exhaust is di-

rected to and all intake air is taken from out-
doors.

Number of 90

degree elbows

4

3

2

1

Maximum

Vent Length

39'

45'

51'

57'

• Do not common vent or connect more than

one appliance to this venting system.

Appliance Adapters
• Use the following adapters to connect the

unit to the venting system.

Manufacturer and

Enclosed

Unenclosed

Product

Hor. Vert.

Hor.

Vert.

Noritz N-Vent

4"

3"

3"

Protech FasNSeal

4"

3"

3"

Protech FasNSeal W2

6"

4"

3"

3"

HeatFab SafTVent

6"

6"

2"

2"

Z-Flex Z-Vent

8"

4"

1"

1"

Flex-L-StaR-34

8"

4"

1"

1"

These clearances are subject to change.
Refer to the UL listing for the proper clearances.

8" (sides)
12"(top)
4"(bottom)

Manufacturer and

Product

Protech FasNSeal

FSAA4

HeatFab SafTVent

9401RYPK

Z-Flex Z-Vent

2SVWA04

Flex-L StaR-34

SRASPSA4

Part No.

• Follow the vent pipe manufacturer's installation

instructions.

• Maintain the same vent pipe diameter all the

way to the end.

• Maintain the following clearances for the

exhaust pipe to combustibles:

• Terminate at least 12"above grade or snow line
• Terminate at least 7'above a public walkway
• Use a condensation drain if necessary

10" (sides)
15"(top)
6"(bottom)

SAR8192-2_035_045_E_J.p65

05.11.29, 9:01 PM

Page 44

Adobe PageMaker 6.5J/PPC