APPENDIX I
FIELD SERVICE
INSTALLATION AND STARTUP CHECKLIST
Part 3:
Starting Unit
__________ 1)
After all checks in Parts 1 and 2 are completed, conduct a startup meeting with customer to discuss the
actual procedures they might require during startup and commissioning. Also, verify with the customer that
their ‘system’ is ready for pumpage.
__________ 2)
When the system is ready, push the start button and adjust the discharge valve to meet the design point
(if required).
__________ 3)
Watch for signs of trouble (look and listen). Again, the unit must run at least ten minutes to flush out the
pump and system.
__________ 4)
Verify that the unit runs smoothly with no unusual noise, vibration, or over heating.
__________ 5)
Run the unit for one hour mechanical test (if possible).
Part 4:
Readings and Notes
A) Readings
Impeller Lift: ____________________ Shaft Runout: _____________________
Megger: __________________________________________________________
Vibration: _________________________________________________________
B) Notes:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
_________________________________________________ ___________________
A-C Fire Pump Representative
Date