Selecting a site

Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:

Near a grounded power outlet

Clean and dust-free

Stable surface free from vibration

Well-ventilated and away from sources of heat

Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.

Checking the package contents

Check the following items from the package:

Acer Altos R5250 server system

Acer EasyBUILD

TM

Acer Altos R5250 accessory box

If any of the above items are damaged or missing, contact your dealer
immediately.

Save the boxes and packing materials for future use.