2 joint plate assembly, underrunning end carriages – R&M Materials Handling WIRE ROPE PACKAGES User Manual
Page 51
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
51/76
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
10.2 Joint plate assembly, underrunning end carriages
Pos. Connection
Friction
rings
BA, BB, SA, SB
Bottom connection
Yes
Tightening torque
Screw size
Tightening torque
M16-10.9 280
Nm
M20-10.9 550
Nm
• Check that joint surfaces are free from dirt, dust and loose particles.
• Place friction rings around screw holes at bottom of end carriage.
• Place joint plate bottom of the end carriage. Make sure, that friction rings are kept in position
during assembly.
• Assemble screws and nuts.
• Assemble joint plate into final position and tighten screws with correct torque.
• Retighten screws after test runs at assembly site.